Flooring Installation in Orleans
Measured, cut and fitted, one board at a time.
Hardwood, laminate, vinyl and tile flooring for homes in Orleans and across Ottawa, plus light commercial work.
Plank 01 / Positioning
- 01
We measure the room before we talk about product.
- 02
We choose a floor that suits how the space is used.
- 03
We leave a floor that is ready for daily use.
Plank 02 / Services
All services- 01Hardwood flooring installationSolid and engineered wood, laid over a checked subfloor with the expansion gaps the room needs.View
- 02Laminate flooring installationClick-lock planks over the right underlayment, cut cleanly around doorways and vents.View
- 03Vinyl and LVP flooringGlue-down and click-lock floors for kitchens, baths, basements and busy main rooms.View
- 04Tile flooring installationCeramic and porcelain set on a stable bed, with attention to the flatness underneath.View
- 05Stair flooring installationTreads, risers and nosing fitted to match or contrast the floor below.View
- 06Subfloor preparationFlatness, moisture checks, underlayment and repair before anything is laid.View
- 07Flooring removalOld carpet, vinyl, laminate or tile lifted and the subfloor exposed for inspection.View
- 08Commercial flooring installationLight commercial floors in offices, shops and clinics, phased around opening hours.View
Plank 03 / The subfloor comes first
The floor you see rests on the one you do not.
A subfloor that is out of flat, or damp, or loose will show through any material laid over it: a hollow under a plank, a tile that rocks, a joint that opens. So the work starts there.
Flatness is checked across the room rather than at a few points. Moisture is checked in general terms, with attention to concrete slabs and basements where ground moisture is a factor. Underlayment is chosen for the material and the room. Wood products are given time in the space to settle before installation.
None of this is visible in a finished floor. All of it decides how the floor behaves in five years.
Plank 04 / Our process
Read the full process- 01
Consultation and site visit
We look at the rooms, the existing floor and what is underneath it, and talk through how the space is used.
- 02
Measure and product choice
Measurements are taken room by room, then we settle on a material that suits traffic, moisture and the subfloor.
- 03
Preparation and installation
Old flooring comes out where needed, the subfloor is checked and corrected, and layout lines are set before the first board.
- 04
Finishing and handover
Trim, transitions and stairs are closed out, the site is cleared, and we walk the floor with you.
Plank 05 / Ottawa seasons
A floor has to live through both ends of the year.
Ottawa indoor air swings hard. Winter air is dry enough to pull gaps open at board ends and along long runs. Summer brings humidity that pushes boards tight against each other. Neither condition is a fault in the floor. Both are reasons to leave the right allowance and to keep the room reasonably steady once the floor is in.
Wood products need time in the room before they are fixed down, so they settle to the same conditions as the space they will live in. The time depends on the product and the conditions, and it is built into the schedule rather than squeezed in at the end.
Most Ottawa homes are heated all winter, which keeps conditions steadier than an unheated garage or cottage. Unheated spaces may need to wait for a warmer, drier stretch before wood goes down, or a different material altogether.
Plank 06 / Service areas
All service areasPlank 07 / Questions
All questionsWhat people ask before work starts.
Which areas do you cover?
Orleans and the surrounding Ottawa neighbourhoods, including Convent Glen, Avalon, Cumberland, Navan, Blackburn Hamlet, Beacon Hill, Gloucester, downtown, Nepean, Kanata and Barrhaven. Light commercial work is quoted the same way as residential work.
How long does an installation take?
It depends on the project. The number of rooms, the condition of the subfloor, stairs and how much old flooring has to come out all move the schedule. The sequence is set out in the written scope before work starts.
Does the old flooring have to come out?
Not always. Some floors can be laid over an existing one if it is sound, flat and dry enough, but the added height at doorways and transitions has to be considered. We check on site and say which way we would go.
Why does the subfloor matter so much?
A floor only performs as well as the surface under it. Hollows, high spots and moisture show up later as movement, noise or open joints, so flatness and moisture are checked before anything is laid.
Do wood floors need to acclimate?
Wood products need time in the room to settle to the conditions of the space. The length of time depends on the product and the conditions, and it is built into the schedule rather than added at the end.
Can you do stairs as well?
Yes. Treads, risers and nosing are fitted to match or contrast the main floor. The stair is usually finished last so it stays clear while the floors below are being laid.
Do you handle light commercial work?
Yes, in offices, shops, clinics and common areas. Work can be phased around opening hours so part of the space stays usable while the rest is being laid.
How is cost worked out?
It depends on the project. Area, material, subfloor condition, stairs and removal all affect the total, so the scope is set first and the cost follows from it.
Plank 08 / Start a project
Request a consultation
Tell us the rooms, the current floor and the timing you have in mind. We reply by email with the next step.
Prefer email? info@orleansflooringinstallation.com